How to use tape production equipment?
Date:2021-01-07 10:03
Publisher:admin
How to use the production equipment of belt conveyor?
Before installation, all parts of the belt production equipment are separated. After the site is selected, place the front and rear intermediate frames on the horizontal ground to maintain a unified horizontal line! To maintain stable operation.
After installation, carry out pre operation treatment for all parts of the machine, including chain, sprocket, bearing, reducer, adding lubricating oil or grease. When the belt production equipment is not in operation, the power supply must be disconnected for the sake of safety.
The work of belt conveyor is divided into two parts, namely printing and coating. In order to produce better products, the two parts have different work division. After the lubrication treatment, the main parts should be debugged to keep them running smoothly without blocking. After the installation of each part, turn on the power supply for test run! During the test run, there is no need to install materials, carry out naked test! Observe the operation of each part! If any abnormality is found, cut off the power.
The installation site of belt production equipment must be on relatively flat and hardened ground, because the belt conveyor needs a good environment for operation, which needs to be considered.
Recommended products of belt production equipment:
BOPP belt Slitter stationery belt Slitter 500 precision coating belt machine
Double axis double knife automatic cutting table double axis rewinder